| The choir area featuring the construction choir and their leader, Herman
Hill. |  |
 |
A view to the church extension. The new windows offer full view to natural
beauty. Note the new ceiling panels and painted walls. And the new slate floor
tiles are being set in place, one by one.
|
In the chapel
the scaffold jiggles as this man measures to determine the needed length for a
ceiling panel. |  |
 | Two
men work together polishing the new limestone alter. One operates the sander and
the other provides cooling water, removing any excess. |
A view along a hallway leading to the first floor of the new wing.
| 
|
 | The
floor tiles are in place and pews await parishioners. Notice the beautiful entry
doors and natural light they allow.
|
Our beautiful altar
awaiting Mass. Notice the color blend, sandstone to limestone, and the return,
seen within the cross.
|  |
 | The
baptismal font as seen from the altar platform. Altar and font adjoin one another
and are carved from the same material, limestone. Stepping stones surround the
font.
|
When you look out from new wing you will see a part
of the church extension and this view of the stained glass window of John the
Baptist.
|  |
 | A
workman is putting the finishing touches onto the floor at the doorways where
you will step from Narthex into the church.
|
| | |
| |
| | |
| | |
| | |